Timur's Warehouse
Previous
Next
About the project
Apartment Features
Floor plan
Location
About the project
In the pond area,
With a super market at the entrance,
To the new Öz-Ar AVM,
It consists of 3+1 and 2+1 flats and workplaces located within walking distance of the Park.
Apartment Features
Start date: August 2014
End date: September 2015
Project features;
• Ground surveyed
• Raft foundation
• Combi heating system
• Sheathing on Ytong insulated
• Insulated glass
• With open parking
• Environmental arrangement has been made
• Building use license
rooms
• 1st class laminate flooring
• Satin paint
• Video intercom
• Interior doors and frames decorative panel press door
Bath
• Bathroom cabinet
• 1st class ceramic
• Shower
• Suspended ceiling
Kitchen
• 3 built-in set
• Specially designed kitchen
Floor plan
Location