Timur's Warehouse

In the pond area,

With a super market at the entrance,

To the new Öz-Ar AVM,

It consists of 3+1 and 2+1 flats and workplaces located within walking distance of the Park.

Start date: August 2014

End date: September 2015

Project features;

• Ground surveyed

• Raft foundation

• Combi heating system

• Sheathing on Ytong insulated

• Insulated glass

• With open parking

• Environmental arrangement has been made

• Building use license

rooms

• 1st class laminate flooring

• Satin paint

• Video intercom

• Interior doors and frames decorative panel press door

Bath

• Bathroom cabinet

• 1st class ceramic

• Shower

• Suspended ceiling

 

Kitchen

• 3 built-in set

• Specially designed kitchen

Our Other Projects

en_GBEnglish